Industrial roof replacement is unlike domestic or commercial work. Industrial roof replacement involves larger scale, complex access, demanding health and safety requirements, and significant consequences when things go wrong.
Roof replacement on industrial buildings is mostly done when the roof is profiled metal sheeting systems with or without single-skin liners and insulation gaps. Some of the older industrial buildings have built-up felt or asphalt on a concrete or steel deck.
Strip and Replace versus Overcladding
The replacement of industrial building roofs involves the removal of the existing roof and the placement of a new roof on the existing roof support (strip and replace) or the placement of a new roof on the existing roof (overcladding).
Large industrial roofs require the application of the Overcladding method. It is less disruptive than the removal of the current roof, maintains the containment of the facility during the roof work, and eliminates the disposal costs of the existing upper metal rodding.
Since the present arrangement already supports I-beams, there will be an additional structural load, necessitating an evaluation of structural integrity before proceeding. However, in the case of a robust structure, it is what is typically preferred, as well as the more economical option. The choice of ‘strip and replace’ is correct when the existing sheeting has deteriorated past the point of being acceptable for overlayment. It is also the option when there exists a structural failure of the sheeting that requires deconstruction and remediation at the level of rafters, or in the event that the client desires a change in the roof profile together with a replacement of the roof and improvement of the structural deck.
Health and Safety on Industrial Sites
Working on an industrial roof brings specific health and safety requirements. Edge protection, working platform systems, and in some cases full scaffolding are standard. For roofs with fragile materials — older profiled sheeting, rooflights that are no longer load-bearing, areas of corrosion — additional protection measures are needed both for the operatives and for anyone working below.
We operate under documented RAMS (Risk Assessments and Method Statements) for every industrial roofing project. These are produced in advance and can be submitted for client approval before work starts. We work within permit-to-work systems on sites that require them and participate in site inductions as a matter of course.
If asbestos-containing materials are present — older cement fibre sheeting, asbestos insulation board, asbestos-containing flashings — a licensed asbestos contractor needs to be involved before any stripping work begins. We can coordinate this as part of the project or work alongside a specialist you’ve already appointed.